GRC Sapphire Springs
By GRC Group in Gottigere, South Bengaluru. Under construction.
Phased Gottigere project; portals disagree on size (2.56 vs 10 acres) and give 2030 completion dates. RERA number is Phase 1. Portal-only.
Official videos from GRC GROUP on YouTube. Press play to watch here.
Homes in this project
2 BHK
1,195–1,340 sq ft super built-up
₹1.25 Cr–₹1.35 Cr3 BHK
1,455–1,635 sq ft super built-up
₹1.67 Cr–₹1.7 CrAll-inclusive prices of units shown available on Housiey (2 BHK Rs 1.25-1.35 Cr; 3 BHK 1,575-1,635 sq ft Rs 1.67-1.70 Cr; smaller 3 BHK types sold out); checked 2026-10-17
Key facts
| Handover | Not stated |
|---|---|
| Status | Under construction |
| RERA registration | PRM/KA/RERA/1251/310/PR/030225/007478 |
| How sure we are | Low: portal sources only |
Where it is
GRC Sapphire Springs, Gottigere
Drive to major office hubs
| To | Typical | Rush hour |
|---|---|---|
| IIM Bangalore, Bannerghatta Road | ~13 min | ~15 min |
| Electronic City Phase 1 | ~22 min | ~27 min |
| Embassy GolfLinks | ~33 min | ~39 min |
| Global Village Tech Park, Mysore Road | ~34 min | ~40 min |
| MG Road and CBD | ~35 min | ~42 min |
| Outer Ring Road, Bellandur | ~37 min | ~44 min |
| Wipro Campus, Sarjapur Road | ~38 min | ~45 min |
| RMZ Infinity, Old Madras Road | ~40 min | ~48 min |
Road routes from OpenStreetMap, scaled for Bengaluru traffic using the TomTom Traffic Index 2025. The location is the centre of Gottigere, not the exact site.
Where these details come from
- www.housiey.com: portal only: areas, prices, RERA number, RERA possession Jul 2030, 31% complete May 2026 (checked 2026-10-17)
- www.squareyards.com: portal only: Phase 1 RERA number, completion 31 Dec 2030, 4 towers and 308 units for Phase 1 (checked 2026-10-17)
- housiey.com: availability: 2 BHK and 3 BHK units on sale (marked limited), some 3 BHK types sold out (checked 2026-10-17)
Ask the builder for the current price sheet, and check the registration on the Karnataka RERA website before you book. How to check RERA.